Loading...
Loading...
Loading...

SMMC launches virtual tour of medical care expansion projects.

August 19, 2021

SMMC launches virtual tour of medical care expansion projects.
Loading...
Loading...

CAY HILL:— St. Maarten Medical Center (SMMC) recently launched a virtual tour of their ongoing Renovation & Resiliency Projects on their YouTube, Facebook, and LinkedIn pages. The projects were made possible in part by funds from the St. Maarten Recovery, Reconstruction, and Resilience Trust fund, funded by the Netherlands and managed by The World Bank, and include several essential upgrades aimed towards expanding and increasing the level of care given at SMMC.
The tour, led by Project Manager Ingeborg Verwoerdt, gives viewers an inside look into completed and ongoing projects such as an upgraded fire detection system, an upgraded medical gas distribution system, the installation of CCTV, the construction of five (5) new double patient rooms, two (2) new operating rooms and an expansion of the Dialysis and Oncology Departments.
The five (5) new double patient rooms, constructed in the patio of the existing Medical/Surgical Ward, will be able to accommodate ten (10) beds and increases SMMC’s capacity within the hospital from seventy (70) to eighty (80). The rooms are designed with the exact layout of the future rooms of the St. Maarten General Hospital with the purpose of acclimatizing staff to the new layout and equipment. The addition of the new Class 1 operating rooms will increase SMMC’s capacity from two (2) operating rooms to four (4) with the ability to perform specialized surgeries and result in a higher volume of surgeries with the goal of further reducing the number of off-island referrals. The expansion of the Dialysis and Oncology Departments allows for the treatment of a higher volume of patients in a comfortable, more patient-friendly environment.
All of the ongoing projects are expected to be completed before the end of 2021 and contribute to SMMC’s goal of providing quality care, close to home, and preparing for the completion of and move to the St. Maarten General Hospital. The virtual tour can be viewed at https://youtu.be/M71VWI_TnT4

Source: https://www.smn-news.com/index.php/st-maarten-st-martin-news/38317-smmc-launches-virtual-tour-of-medical-care-expansion-projects.html

Loading...

Headlines

MLK students can wear new or  existing uniform next school yr. | The Daily Herald

August 11, 2026

MLK students can wear new or existing uniform next school yr. | The Daily Herald

The new MLK uniform for girls. DUTCH QUARTER--Students at Dr. Martin Luther King Jr. Primary School will have a brand new uniform option when the 2026-2027 school year begins on August 17, with the upcoming school year designated as a transition period allowing students to wea...

August 11, 2026

Detention Sector Reform Program Advances Rehabilitation Efforts Through Structured Sports and Fitness Initiative | Soualiganewsday

SINT MAARTEN (GREAT BAY) - As part of the ongoing Detention Sector Reform Program (DSRP), the Ministry of Justice, in collaboration with its implementing partner, the United Nations Office on Drugs and Crime (UNODC), last month piloted a structured sports and physical fitness...

August 11, 2026

St. Maarten parents, students urged to be vigilant as fake housing scams on TikTok surge in Netherlands | The Peoples Tribune

AMSTERDAM--St. Maarten parents and students seeking accommodation in the Netherlands should exercise increased caution when responding to housing advertisements online, particularly on social media, following a sharp rise in reports of fraudulent student housing advertisements...

Loading...
Loading...
Loading...