Loading...
Loading...
Loading...

Water cuts: production has resumed on two lines | FAXINFO

October 31, 2023

Water cuts: production has resumed on two lines | FAXINFO
Loading...

In its latest press release from this Monday, October 30, SAUR informs the population that water production has been restored to 2/3 of normal.

Saint-Martin has been without water since last Saturday. The cause is power outages due to rain, deterioration in the quality of pumped water due to swell and condensation in electrical cabinets. If SAUR agents work tirelessly to repair the network, no timetable for a return to normal can be put forward at this stage.

Loading...

Monday October 30 at 14:45 p.m., the level of the Galisbay head reservoir is sufficient and allows supply to the Mont des Accords reservoir, SAUR declares in a press release. However, the current replenishment of water will be very gradual, the points furthest from the reservoirs will remain out of distribution longer than the nearby points. Priority is given to a return to power supply to the Louis-Constant Fleming hospital center and the EPAHD.

SAUR Saint-Martin invites its most remote subscribers to organize themselves accordingly: a drinking water distribution ramp is currently accessible at the UPEP in Galisbay to allow the public to access drinking water.

 

At 18h45, SAUR informed the population that the return to drinking water supply continues on the basis of the network served by the Mont des Accords reservoir, the first to have been postponed due to the emergency linked to the hospital center and EPAHD (Concordia – Terres Basses). All areas are in the process of reopening in this sector.

Simultaneously, the supply of the Morne Valois reservoir is underway in order to restore supply to the eastern part of the island. Here again, the return of water will be gradual.

As a reminder, this gradual return is motivated by two essential factors: the stock of available water and the need to secure the pipes which do not cope well with excessive pressure deltas.

The SAUR Saint-Martin teams remain mobilized to increase production capacity which is still at 2/3 of its nominal capacity.

Nighttime outages may be necessary if the levels do not allow the distribution of drinking water to be maintained, users are therefore encouraged to consume responsibly.

 

WARNINGS, when water is refilled, a brown color may appear, this is directly attributable to the stagnation of water in the networks. SAUR Saint-Martin naturally recommends that you do not use it and leave it running for a few minutes to purge the network.

https://faxinfo.fr/en/coupures-deau-la-production-a-repris-sur-deux-lignes/

Source: https://www.sxm-talks.com/local-news/water-cuts-production-has-resumed-on-two-lines-faxinfo/

Loading...

Headlines

Charlotte Brookson Academy closes after student tests positive for COVID | The Daily Herald

September 16, 2026

Charlotte Brookson Academy closes after student tests positive for COVID | The Daily Herald

PHILIPSBURG--Charlotte Brookson Academy for the Performance Arts (CBA) was closed for deep-cleaning on Wednesday after a student tested positive for COVID-19 and other students and teachers reported flu-like symptoms, Education Minister Melissa Gumbs said.  Gumbs said sch...

September 16, 2026

PM: GEBE Plans 6.5 MW of solar as St. Maarten pushes renewable energy transition | The Peoples Tribune

GREAT BAY--Prime Minister Dr. Luc Mercelina on Wednesday placed renewable energy at the center of St. Maarten’s long-term electricity strategy, announcing that NV GEBE is advancing major solar-generation and battery-storage projects aimed at reducing the country’s dependence o...

September 15, 2026

Theo Heyliger discharged from hospital, transferred back to prison | The Peoples Tribune

GREAT BAY--Former Member of Parliament Theo Heyliger has been discharged from the hospital and transferred back to prison, according to an update Tuesday from his wife, Deputy Prime Minister and Minister of Tourism, Economic Affairs, Transport and Telecommunication Grisha Heyl...

Loading...
Loading...
Loading...