Loading...
Loading...
Loading...

Minister Doran: Main road repairs and dirt road hard surfacing given priority

January 20, 2022

Minister Doran: Main road repairs and dirt road hard surfacing given priority
Loading...

PHILIPSBURG: The Honorable Minister of Public Housing, Spatial Planning, Environment & Infrastructure (Ministry of VROMI) Egbert Doran, said on Wednesday that an amendment has been submitted for the capital expenditure budget 2022 – a total budget of Naf.8.0 million – where funds previously allocated for the Ring Road, will now go towards the repair of the main roads – transportation arteries – throughout the country.

Loading...

Through an amendment “nota van wijziging”, the Main Roads are targeted to be improved in place of the Ring Road Phase 1.

After careful consideration and consultation with the respective departments of Infrastructure Management and New Works, it has been decided that the Naf.5.0 million allocated towards the Ring Road Phase 1 project would be geared to the repairs of the Main roads. An amount of Naf.3.0 million remains budgeted for the hard surfacing of dirt roads.

The country’s infrastructure has now reached a point whereby a large portion of the road network has outlived its lifespan, has become worn and therefore needs to be improved and in some cases replaced.

The initiative to reserve a budget for the pavement of roads arises from the shortage of budget and allocation for this within the Ministry of VROMI. There is only a budget for the maintenance of the existing roads, which is used for road surfacing. With the lack of an available budget, funds are needed to create proper infrastructure.

The Ministry of VROMI will enter into investments where the positive effects on the economy are greatest such as the urban regions around PJIAE airport, the capital city of Philipsburg, and the main road artery to Port St. Maarten.

The ministry’s goal is to also improve the traffic flow on the main roads of Sint Maarten through various measures, such as and not limited to resurfacing, road traffic lines, zebra crossings, reflectors, and the creation of sidewalks for pedestrians.

A budget must be reserved to further expand the road network. Smaller road connections that do not fall under the category of a connection may qualify via the Government Website.

The post Minister Doran: Main road repairs and dirt road hard surfacing given priority appeared first on Faxinfo.

Source: Faxinfo https://www.faxinfo.sx/2022/01/20/minister-doran-main-road-repairs-and-dirt-road-hard-surfacing-given-priority/

Source: https://www.faxinfo.sx/?p=4610

Loading...

Headlines

Head-on collision between two vehicles  claims life of one, and injures two others | The Daily Herald

July 10, 2026

Head-on collision between two vehicles claims life of one, and injures two others | The Daily Herald

The accident scene Thursday on the French side of the Cole Bay border monument. (Robert Luckock photo) MARIGOT--A 76-year-old man was pronounced dead following a head-on collision between two French-side registered vehicles on the Bellevue RN7, close to the Cole Bay border mon...

July 09, 2026

Court Rules Mullet Bay Beach is public, Sun Resorts owns land behind shoreline | The Peoples Tribune

GREAT BAY--The Court of First Instance has ruled that Mullet Bay Beach remains public and is not owned by Sun Resorts Limited, rejecting the company's claim that the beach itself passed into private ownership through historic land transfers dating back to 1852. The Court,...

July 09, 2026

GEBE introduces temporary collection policy, resumes disconnections July 20 | The Daily Herald

A sample of a Dunning Notice. PHILIPSBURG--NV GEBE has introduced a Temporary Collection Policy aimed at helping customers bring their accounts up to date while maintaining electricity and water services through flexible payment arrangements and customer assistance programmes....

Loading...
Loading...
Loading...